Directed Electronics Viper ESP 540 Przewodnik Instalacji Strona 149

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 148
TEST REPORT
Page 4 of 33
Issue Date: 2
nd
March 2010.
SGS Serial Number:
AUT130731/4/GH/10.
3. Purpose of Tests
To perform the relevant tests and assess the product for compliance with the above specification.
4. Deviations or Exclusions from the Test Specifications
There were no deviations from the test specifications.
The scope of the inspection is limited to what is specified in the clients instructions and does not include
any other checks or tests.
5. Operation of the EUT During Testing
5.1 Configuration and Peripherals
Peripheral or support equipment was required for the tests. (LEDs were connected for
monitoring state changes).
5.2 Operating Mode and Environmental Conditions
The operating modes and environmental conditions used for each individual test are
described in the test results section of this report.
U
K
A
p
p
r
o
v
a
l
A
u
t
h
o
r
i
t
y
25-Mar-10
Przeglądanie stron 148
1 2 ... 144 145 146 147 148 149 150 151 152 153 154 ... 177 178

Komentarze do niniejszej Instrukcji

Brak uwag