Directed Electronics D800 Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Wzmacniacze audio Directed Electronics D800. Directed Electronics D800 Service manual [en] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - Installation

Scoreboard Installation and Service ManualF290 Rev 0600

Strona 2

BP-3 External Battery Pack: 12V gel-cell rechargeable battery used asexternal power source for the scoreboard.CAD-P Caddy: Wheeled base for 60-inch wi

Strona 3 - Table of Contents

3-1This operation is easiest to accomplish with the scoreboard/clock modulelying on a raised flat surface such as a table. Be sure to place the score-

Strona 4 - 7 Service

Step 3: Repeat Step 2 for the other side of the module.Step 4: If you purchased a Sponsor Panel, Model SP-A, the sponsor mod-ule mounts above the top

Strona 5

Step 1: Install pole stands (supplied with caddy) into scoreboard usingquick connect pins.Step 2: Bolt stand clamps (8 each) to Unistrut in locations

Strona 6

Figure 14: Pole MountsNote: See the Pole Placement Table on the following page for vari-ous Dimension “A” measurements according to scoreboard model.B

Strona 7

3-5Although we have recommended minimum standards for pipe selectionand installation, the responsibility rests with you to determine whether:(1) the i

Strona 8

Step 2Step 3Step 43-6Begin by mounting the top (uppermost) module, either the sponsor panelmodule if applicable or the top line of the scoreboard modu

Strona 9 - Optional Accessories

3-7Note: For Model FB-2 Football/Baseball Combination Scoreboard,two middle sign panels are included, one for football and one forbaseball. Slide the

Strona 10

3-8First determine the total number of modules you are installing:a. a one-line scoreboard module only for a total of one module. (Example:Model BA-1,

Strona 11 - Scoreboard Mounting

Leave a 9 1/2 inch separation between modules for the signage, and mountthe second module underneath the top module using the same procedureas in Step

Strona 12 - Optional Caddy

Colorado Time Systems Corporate Office1551 East 11th StreetLoveland, CO 80537 USASales : 800-279-0111 or +1 970-667-1000Service: 800-287-0653 x256 or

Strona 13 - Instructions

3-10To mount your bottom sign panel, follow these steps:a. Place the panel in the bottom groove of the module (BB-3).b. Slide the sign panel brackets

Strona 14 - Mounting Using Pole Mounts

These guidelines are designed to facilitate the installation of lightning pro-tection on all outdoor mounted scoreboards. We recommend owners of out-d

Strona 15 - Table: Pole Placement

4-21. Should not be less than 1/2 inch (12.7mm) in diameter and 8 feet (2.4m)long, see Fig. 22 below.Figure 222. Composition shall be copper clad stee

Strona 16

BondingGround Rods4-34. Metallic mounting structures can be used as down conductors only ifelectrically bonded to the scoreboard and ground rod.1. Bon

Strona 17 - Mounting Using Wall Mounts

Figure 25Figure 26An acceptable substitute ground rod can be a metallic water pipe as longas it extends at least 10 feet below grade.The lightning pro

Strona 18

Refer to the “Bonding” section under “Installation Materials andSpecifications” for bonding conductor to the ground rod and scoreboardframe.Once the c

Strona 19

Concrete acts as an insulator, therefore, the structure needs a ground rod.Note: Fence mounting of scoreboards is prohibited. A fence actslike an ante

Strona 20 - Fence Mounting

5-1Depending upon the particular model you have purchased, you will need toconnect several items to the main control circuit board. The control boardi

Strona 21 - Introduction

5-2Figure 30 - #4290 Control BoardThen identify the following:a. two speaker connectors (lower right of control board)b. two 1/4 inch phone jacks used

Strona 22 - Conductors

5-3Figure 31 - #2860 Control BoardFigure 32 - #4290 Control Board

Strona 23

Table of Contents1 IntroductionReceiving Your Equipment . . . . . . . . . . . . . . . . . . . . . .1-12 System Components and DefinitionsOptional Acc

Strona 24

If your scoreboard contains two lines of display (two module system), thetop module mates to the bottom module via interconnect cable.Note: On the con

Strona 25 - Conductor Routing

5-5Switches #2,#3 and #4 on the control board #2860 are not applicable atthis time. Switch 1 only applies to Model FB-2 Football/BaseballScoreboard. T

Strona 26

5-6Fig. 33 on the following page shows a parts list and illustration if you careto build a wall box yourself. Colorado Time Systems offers a data cabl

Strona 27 - Control Board

If you ordered a single scoreboard without a wall box, the next diagramillustrates the data cable connections, see Fig. 35.If your installation requir

Strona 28

Figure 375-8

Strona 29

All Colorado Time Systems’ scoreboards are designed to operate on regular115 VAC electrical current using a standard grounded wall outlet (G.F.I),inst

Strona 30 - Control Boards

Colorado Time Systems’ battery operated scoreboards and clocks aredesigned to operate 6 to 8 hours with a fully charged battery and moderateuse of the

Strona 31 - Operator’s (Keyboard) Console

1) To charge batteryControl Board Switch: off positionPower Cord: plugged inConsole LCD display: Lo b2) To store batteryControl Board Switch: off posi

Strona 33

This section will assist you in identifying any scoreboard problems bylearning to recognize the specific part of the scoreboard that is malfunc-tionin

Strona 34 - Figure 37

Correct Use of ON/OFF Switch . . . . . . . . . . . .6-37 ServiceWhat To Do If “Nothing” Works . . . . . . . . . . . . . . . . . .7-1Trouble Shooting—A

Strona 35 - Power Requirements

Note: If your scoreboard includes a battery (either internal orexternal), turn the ON/OFF slide switch located inside the score-board on the control b

Strona 36 - External Battery Operation

The two types of sounds (audio and sports tunes) are sent through theswitch to the amplifier and directed to the speaker, see Fig. 38 below.Figure 38E

Strona 37 - ON/OFF Switch

Possible Solutions:a. Confirm that the speaker is plugged into the control board. Confirmthat the data cable is plugged in all the way.b. The control

Strona 38

Note: Never apply lubricants of any kind onto the digit bearings.Possible Solutions:a. Check that the data connector on the individual digit is plugge

Strona 39

Possible Solutions:a. Check the voltage outlet. Confirm that the outlet is supplying 115 volts.b. Confirm that you are not testing the scoreboard with

Strona 40 - Trouble Shooting-Audio

The following table shows which diodes correspond to each segment coil aslettered in Fig. 43 on the following page.Remove all electrical power to the

Strona 41

Figure 43Possible Solutions:a. If there is no display in the console’s LCD, first check that electricalpower being supplied to the scoreboard is on. I

Strona 42 - Trouble Shooting-Digits

b. If the console display indicates “Lo b” and some digits on the score-board do not count (flip) properly, the battery is probably very low andneeds

Strona 43

Using the schematic in Fig.(s) 43 or 44, check the output of the threeregulators.Note: For control board #2402 type only, if the scoreboard used abatt

Strona 44 - Testing Digit Coils

Figure 45Figure 46Using a volt meter, measure the voltage at the phone plug which wouldnormally plug into the operator’s console.Figure 47Step 37-11

Strona 45 - How to Remove a Digit

1-1Please accept our thanks for choosing Colorado Time Systems as yourscoreboard company. Your new scoreboard combines simplicity of installa-tion wit

Strona 46

To wire data cable to the phone plug, see Fig. 48 below.Figure 48If the speaker does not emit sound, execute the following:Confirm that the speaker co

Strona 47

Batteries are capable of delivering high current if the output is shorted. Donot allow any conductive instrument (screwdriver, etc.) to make contactwi

Strona 48 - Trouble Shooting-Data Cable

Note the position of the battery so you can replace the new battery in thesame position.Unplug the wires(one black, the other red) from the two batter

Strona 49

Figure 517-15

Strona 51 - To Replace the Battery

Colorado Time Systems, llc. warrents this Product against any defects inmaterials and workmanship affecting electronic and mechanical performance for

Strona 52 - Battery Storage

Some states do not allow the exclusion or limitation of incidental or consequential damages, so the above limitations or exclusions may notapply to yo

Strona 53 - Figure 51

2) Check all concealed damage immediately upon receipt of equipment.Report any damage directly to the freight carrier.3) Use the packing list included

Strona 54

2-1The following items are used throughout this manual. A working knowl-edge of them increases your potential for successful installation and opera-ti

Strona 55

2-2Main Control Board: The printed circuit board that contains all theelectronic components needed to operate the scoreboard and console,and therefore

Strona 56

Digit Enable Cable: The cable (ribbon style) inside the scoreboard, thatconnects the scoreboard digits to the control board.Microphone: Allows for ope

Komentarze do niniejszej Instrukcji

Brak uwag